Toulouse’s 3rd metro line ray_mezzanine_v3

Toulouse / secteur centre

Toulouse’s 3rd metro line

Toulouse’s 3rd metro line will connect the major hubs of the Airbus group and its subcontractors, which together employ around 60,000 people,
mostly located in the northwestern quarter of the metropolitan area.

Toulouse’s 3rd metro line m3c_trace

We are leading the architectural coordination for the consortium and are responsible for four underground stations, including Marengo-Matabiau, the station connected to the main railway hub.

Toulouse’s 3rd metro line bon_mezzanine_v11

The stations will reflect the thematic identity «Toulouse, a land of blue-sky thinking», defined in the design charter we developed in previous years.

Its guiding principles: a strong network identity, clarity, comfort, and spatial legibility, with extensive use of white and optimal maintainability to ensure a lasting high-quality passenger experience.

Toulouse’s 3rd metro line mat_ext_v8

Status

Design 2019/2021 - Completion due 2025

Location

Toulouse / Blagnac (31)

Client representative

Tisséo Ingénierie

Client

Tisséo Collectivités (SMTC)

Commission

Architectural coordination of the centre section + 4 stations design

Programme

16,6 km de tunnel, 14 stations, 17 ouvrages annexes

Cost

1.300 M€

Design team

Systra + Arcadis + Richez_Associés + Taillandier + Séquences + 8’18’’